And like BWS, Belizeans are also concerned about where the materials from the dredging will go, and whether marine life will be affected if it is dumped in the sea. Allan Herrera from Nextra Environmental and Engineering Consultancies said that the dredge spoils will be placed near or on shore, within the area owned by PBL.

Tags Allan Herrera PBL